Method vs. MS-Project other
  • Display detailed gantt chart directely in IE-browser
  • Import plans from MS-Project .mpp files, MS-Project server or a XML url
  • Collect comments/progress feedback through email/web
  • Document distrubution (level5)
  • Use chains & milestones in addition to %complete
  • Update plan from web
  • Earned value analysis (S-Curve) on level 1 to 2
  • Unlimited number of baselines
  • All functionality available from Web
  • Resources
  • Unlimited number of templates
  • Automatical reminders through email and SMS
  • Move the projectcontrol down to the engineers, and make them partisipate in the plan
  • Use EasyProject with or without MS-Project
  • Report progress on level3 with milestons/chains
  • No need for downlading extra components like Java or Activex
  • Typical MS-Project functionallity is extened with offshore terminology and needs for special solutions not offered in MS-Project
  • Support resolutions from 1024x768 and more
  • Easyproject Gantt charts for .NET is available to implement in other .NET systems
  • Produce earned value analyses (S-Curves) directely from your existing MS-project plans
  • Use your existing SAP data in EasyProject through standard RFC interface (DCOM connector)
  • Use resusable chain/milestones to create sub activities under level3 activities
  • Risk evaluation
  • Recalulated critical line based on a spesific miletone. Add new network relations in EasyProject
  • MS-Project's critocal line only relate to the last date of the plan sometimes becomes useless in a more advanced plan. Identify the critical activities of the project according to "real project" and not a simplified mathematical model.
  • Distribute documents/files with revisos and process status (in progress, beeing verifyed, issued and others). A chooses status can lock the files from beeing changes/deletes.
  • MS-Project have no document management model
  • Methodes of reporting progress;

    »Percent complete.
    »Activity milestone (milestone chains).
    »Check list. Each subactvity hava weight and the total percent compleet for the subactvities is beeing used at level 3.
    »Document package. The level 3 percent complete depends how many documents in the sub package have reached actual. A level 5 document system bust be configured against EasyProject.

    EasyProject can collect project data from various sources;

    »MS-Project .mpp file or server (level3)
    »SAP (level3 and level5)
    »Any XML source
    »Templates

     